Focchi Curtain Walling

Serafico 200

Rome

The scope of works for the project at via del Serafico 200, Rome, involved the removal of the existing façade, and the design, supply and installation of a new external wall system, as described later. It was anticipated that the building would remain operational during the construction works, for this reason safety issues in particular at the main entrance and at public areas externally were given top priority and the need to prevent unnecessary disruption and noise during office working hours were also of prime importance. The installation was organised in such a manner that not more than five days would lapse between the removal of the old façade from an area and its replacement with a new unitised panel.

Credits

Architect: PR.AS - Roma

Client: M.S.M.C. IMMOBILIARE Srl

Photographer: D. Domenicali

The tecnology

Unitised curtain walling with structurally silicone bonded glazing units (12.000 mq.)

The design of the project consisted of a unitised system of extruded aluminium profiles which were thermally coloured, onto which double glazed units were structurally silicone bonded, this allowed Focchi to conform with certain requirements of the client, both during construction and for the finished building e.g.

The construction of the units system was carried out in our factory, the shapes of the profiles of the mullions and transoms allowing them to be coupled together in a series of male and female joints. Setting Blocks were used to distribute evenly the weight of the glass to the lower transom and the structural sealing of the DGU’s to the perimeters of the aluminium units was carried out following the guidelines and recommendations of the structural sealing manufacturer, under controlled factory conditions.

Serafico 200Serafico 200

Versione italiana

* to correctly display this site, you need the free Macromedia Flash Player plugin (click here to download) and javascript enabled on your browser.